TotalEnergies, OQEP break ground on Marsa LNG plant in Oman

May 01, 2025

TotalEnergies and OQ Exploration and Production have broken ground on the Marsa LNG plant in Oman, one year after reaching final investment decision on the project.

The 1 million ton per annum (MMtpa) liquefaction plant is being built by Marsa LNG LLC, a joint company between TotalEnergies (80%) and OQEP (20%). The LNG production, which is expected to start in the first quarter of 2028, is primarily intended to serve the marine fuel market (LNG bunkering) in the Gulf.

Low carbon intensity

The Marsa LNG plant is fully electrified and combined with a 300 megawatt-peak (MWp) photovoltaic solar farm that will supply the equivalent of the plant’s annual energy needs. Marsa LNG will therefore be one of the lowest carbon intensity LNG plants in the world, with less than 3 kg CO2e/boe of scope 1 and 2 emissions. For reference, this is 90% lower than the average carbon intensity of LNG plants in the world, which stands around 35 kg CO2e/boe1.

The Marsa LNG site has been selected to establish the first LNG bunkering hub in the Middle East. A charter contract for a new LNG bunkering vessel has been signed by Marsa LNG LLC. This vessel, named Monte Shams, is under construction and will be stationed in Sohar from 2028, where it will supply LNG to a wide range of vessels (container ships, tankers, large cruise ships).

Ships using LNG in Sohar will be able to further reduce their GHG emissions due to the low carbon intensity of the LNG production in Marsa LNG, and local bunkering without the need to transport LNG to a distant bunkering port.

"I'm very proud to see Marsa LNG breaking ground, alongside our longstanding partner OQEP, and with the strong support from the Sultanate’s authorities," said Patrick Pouyanné, Chairman and CEO of TotalEnergies. "This flagship project demonstrates that LNG production can be very low carbon, contributing to making gas a long-term transition fuel. With an ambitious technical design, we intend to set the standard and pave the way for the next generation of low-emissions LNG plants across the world. We also offer an effective way to support the shipping sector’s energy transition, by providing lower-emissions marine fuel in a key location at the entrance of the Gulf.”

“The Ministry reiterates its steadfast commitment to supporting downstream energy projects as a vital pillar of economic integration across the industrial, trade, port, and logistics sectors," said His Excellency Salim bin Nasser Al Aufi, Minister of Energy and Minerals. "The Marsa LNG project, a strategic collaboration project between OQ Exploration & Production and TotalEnergies, embodies this commitment by developing advanced infrastructure for supplying vessels with LNG as an alternative clean fuel."

"At OQEP, we are committed to driving innovation and sustainability in Oman’s energy landscape," added Ahmed Al Azkawi, CEO of OQEP. "The Marsa LNG project represents a solid step forward, harnessing cutting-edge technology and strategic collaboration to ensure a cleaner, and affordable energy future. As the first LNG bunkering hub in the Middle East, Marsa LNG will play a pivotal role in reducing emissions in the shipping industry while reinforcing Oman’s position as a key player in the global energy sector. We take immense pride in contributing to this transformative journey—one that sets new standards for low-carbon energy solutions."

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.