Rosneft launches second field in Erginsky cluster

June 04, 2019

MOSCOW -- Rosneft has put into commission West Erginskoye field as part of the Erginsky cluster. CEO of Rosneft Oil Company Igor Sechin ordered to launch the first oil shipment via teleconference during the Annual General Meeting of Shareholders of the Company that is taking place in St. Petersburg.

West Erginskoye field was prepared for the commissioning in the shortest time possible—in less than a year and a half. Such high rates of field development were possible to achieve due to the use of new methods of drilling and well construction, modern technology and engineering solutions, as well as the existing infrastructure of Kondinsky field.

There are 49 wells drilled at West Erginskoye field at the moment. The recoverable reserves of the field amount to 23 million tonnes of oil.

In order to ensure the efficient production of the hard-to-recover reserves of the Erginsky project, most advanced technology is applied: horizontal drilling managed in real time, multi-stage fracing featuring high-tenacity polymer propping agent, and other solutions for reservoir performance.

Over 130,000 tonnes of materials, equipment, and fuel were brought to West Erginsky field in harsh transport infrastructure conditions. The main load of cargoes for construction and operation was delivered via winter roads. At the field, infrastructure facilities were built, including a booster pump station and a 48-km pipeline to the central gathering plant of Kondisnkoye field. All of the equipment was manufactured in Russia. Over 500 highly qualified builders and other specialists were working at the filed daily. As for rotating personnel, they were provided with comfortable housing and recreational areas in shared households of the field support base.

A power plant with a total capacity of 18 MW was commissioned at the field, which fully provides the production infrastructure with electricity, including through the rational use of associated petroleum gas.

Rosneft has established the new oil and gas production centre in Khanty-Mansi Autonomous District—Yugra, a key region for the Company, where its large assets are located, such as RN-Yuganskneftegaz, Samotlorneftegaz, Varyeganeftegaz, and Nyaganneftegaz. Erginsky cluster is one of the priority projects for Rosneft.

The Company’s integrated approach and the sequential commissioning of the Erginsky cluster with a single system of transport, energy supply, and development management ensure the high synergy and accelerated development of the cluster’s resource potential.

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.