Petro Matad begins Heron-1 testing in Mongolia

October 15, 2019

ISLE OF MAN - Mongolian oil explorer Petro Matad Limited has commenced testing operations at the Heron-1 well in the north of Block XX, eastern Mongolia.

The DQE Testing Rig #1 has been mobilized from Block XIX to the Heron-1 location and rigged up, and testing operations have now commenced. If required, reservoir stimulation equipment is in Block XIX and is readily available. The testing operations on Heron-1 are expected to be completed during October.

At the nearby Gazelle-1 well, drilling with DQE International rig #40105 is progressing on schedule.

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.