Gazprom Neft to conduct seismic survey in Iraqi Kurdistan

March 24, 2015

MOSCOW -- Gazprom Neft Middle East, the operator of Gazprom Neft’s projects in Iraqi Kurdistan, is to conduct a 2D seismic survey on the south-eastern section of the Halabja Block.

The technical equipment and personnel required for the survey are being transferred from the south-western section, where the company has already completed a survey spanning 225 linear km. 2D seismic surveys covering approximately 870 linear km are scheduled to be conducted on the Halabja Block by the end of the year.

In 2014, a 2D seismic survey covering 130 linear km was conducted on the block. The first exploration well is expected to be drilled in 2015/2016.

Mikhail Kholodov, CEO of Gazprom Neft Middle East, said, “The Halabja Block has until now undergone very little geological study. Conducting seismological surveys is the first step towards identifying the optimal location for an exploration well and these provide a significant amount of new information on the structure of the Block.”

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.