December 1998
Industry At A Glance

98-12_tech_new-fig2.html (Dec-1998)

A monthly magazine offering industry news, statistics and technical editorial to the oil and gas drilling, exploration and production industry.

 

 

Figure 2

Fig. 2.  Build-up pressure survey chart from test in gas-lift well. Note 12-hr flow, 98-hr shut-in, and 24-hr equalizing modes.

Back


Copyright © 1999 World Oil
Copyright © 1999 Gulf Publishing Company

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.