Gazprom Neft drills first-ever multi-lateral well in Russia

January 10, 2018

MOSCOW -- Gazprom Neft subsidiary Gazpromneft-Yamal has completed construction of Russia’s first-ever multi-lateral well with four horizontal cased-hole side tracks, at its Novoportovskoye field. A total 6,756 m was drilled, including 4,411 m drilled in the target strata. The well was constructed in 39 days at a rate of 5.78 days per 1,000 m.

Drilling horizontally branched wells facilitates a manifold increase in drainage from disjointed low-permeability strata, significantly increasing the oil recovery factor at productive strata and bringing marginal reserves into development without the need to drill additional wells. Russian-produced equipment was used in well construction, retooled in line with the specific geological conditions of Novoportovskoye field.

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.