July 1998
Industry At A Glance

98-07_drilling-mojarro_T4.html (Jul-1998)

A monthly magazine offering industry news, statistics and technical editorial to the oil and gas drilling, exploration and production industry.

 

  Table 4. New well design to drill slimhole with only drill pipe  
Drill pipe design
Pipe data

Tool joint data

Section OD, in. Wt., lb/ft Grade Torsional yield, ft-lb Tensile yield, 1,000 lb Connection type, in. IF OD, in. ID., in. Torsional yield, ft-lb Tensile yield, 1,000 lb Make up torque, ft-lb Torsion ratio tool jt. to pipe

1 4-1/2 16.60 E-75 30,800 330 4 6-1/4 3-1/4 34,000 901 20,400 1.10
2 4-1/2 16.60 E-75 30,800 330 4 6-1/4 3-1/4 34,000 901 20,400 1.10
3 3-1/2 13.30 E-75 18,600 271 3-1/2 4-3/4 2-11/16 18,300 587 11,000 0.98
3 3-1/2 13.30 X-95 23,500 344 3-1/2 5 2-9/16 20,300 649 12,200 0.86
Drill collar / heavy weight pipe design
Drill collars

Heavy weight

Section Bit size, in. No. OD, in. ID, in. Length, m Stabilizers No. OD, in. ID, in. Length, m Wt., lb/ft Mud type

1 12-1/4 3 8 2.813 30 1 & 3 13 4-1/2 2.750 117 42.30 WBM
2 8-1/2 9 6-1/2 2.813 90 bit, 1,3,9 12 4-1/2 2.750 108 42.30 OBM
3 5-7/8 9 4-3/4 2.000 90 bit, 1,3,9 12 3-1/2 2.188 108 25.50 OBM

Back


Copyright © 1999 World Oil
Copyright © 1999 Gulf Publishing Company

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.