December 1998
Industry At A Glance

98-12_tech_concentric-fig1.html (Dec-1998)

A monthly magazine offering industry news, statistics and technical editorial to the oil and gas drilling, exploration and production industry.

 

 

Figure 1a
Figure 1b

Fig. 1.  Installation of the downhole injection system can be made in an average 3 hr, without need for a rig and without interruption to a flowing well.

Back


Copyright © 1999 World Oil
Copyright © 1999 Gulf Publishing Company

FROM THE ARCHIVE
Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.