Videos ///

What happens when two of the world’s subsea leaders get together?

Friday, May 15, 2015 12:00 AM

John Gremp, chairman, president and CEO of FMC Technologies, and Thierry Pilenko, chairman and CEO of Technip, discuss how Forsys-Subsea will revolutionize subsea field architecture from concept to delivery and beyond.

Statoil brings Valemon on stream

Tuesday, April 28, 2015 12:00 AM

Statoil and its partners started production from Valemon field on Jan. 3. Recoverable reserves from the North Sea field are estimated at 192 MMboe.

Conclusions from East Mediterranean Gas Conference 2015

Tuesday, March 24, 2015 12:00 AM

Adrienne Blume, the managing editor of Gas Processing, World Oil's sister publication, recaps on this year's Eastern Mediterranean Gas Conference (EMGC).

Well Control VI — Handle Pressure Like a Pro

Sunday, March 01, 2015 12:00 AM

Well control incidents don’t come with a 4-day training course in front of them. When unexpected trouble arises, readiness is critical. That's why Check-6 developed the Well Control VI training system with “Virtual Instructor” technology – to maximize competency so your operation is READY to handle the unexpected. The Well Control VI is a deployable and professionally vetted training system loaded with over 120 interactive and simulated lessons, giving your crews the ability to routinely perfect their well control skills – BEFORE kicks happen.

The Building of Edvard Grieg

Monday, February 23, 2015 12:00 AM

The production platform for Edvard Grieg field has moved from the drawing board to reality, and is now beginning to resemble a real offshore platform. At present time more than 4,000 people are occupied with work on the Edvard Grieg development. The larger part can be found at Kvaerner’s yard at Stord where the topside is being assembled and at Aker Solutions yard in Egersund where the process module is being manufactured. Earlier this year the jacket was successfully delivered from Kvaerner Verdal and installed offshore at the field location, whilst the living quarter was delivered to the yard at Stord from Apply Leirvik. When the topside is assembled on to the jacket, the installation will have a total height of 257 metres, including the flare tower. The jacket weighs approximately 14,500 tons, and the topside 21,000 tons.