Interra spuds development well in Myanmar's Chauk field

5/9/2014

Interra spuds development well in Myanmar's Chauk field

SINGAPORE -- Interra Resources informed its shareholders that its jointly controlled entity, Goldpetrol Joint Operating Company (Goldpetrol), has commenced drilling development well CHK 1187 in the Chauk oil field in Myanmar.

Interra has a 60% interest in the Improved Petroleum Recovery Contract of the Chauk field and also owns 60% of Goldpetrol, which is the operator of the field. CHK 1187 is being drilled using Goldpetrol’s LTO 350 rig, thus costs are anticipated to be relatively low. Interra’s share of the cost of drilling is funded from existing funds on hand.

CHK 1187 is to be drilled to a targeted depth of 2,750 ft in the Chauk South Central fault block as an offset to wells CHK 1167 and CHK 1169, both of which were completed as oil producers in 2013. The primary objective will be to accelerate production from reservoirs that currently produce oil from these and other wells in the fault block.

Interra estimates that the results of the drilling and completion should be available in approximately six weeks.

Related News ///

FROM THE ARCHIVE ///

Comments ///

comments powered by Disqus