Packers Plus, Geodynamics complete geothermal well in Australia's Cooper basin

8/20/2013

Packers Plus, Geodynamics complete geothermal well in Australia's Cooper basin

KUALA LUMPUR -- Packers Plus Energy Services Inc., in partnership with Geodynamics Limited, has successfully completed a  vertical geothermal well, Habanero-4, as part of Geodynamics' Innamincka Deeps Project in the Cooper basin of South Australia.

"The success of this job has enabled Geodynamics to commission their 1MWe Habanero Pilot Plant producing Australia's first Enhanced Geothermal Systems (EGS) generated power," said Mark Rivenbark, Packers Plus Director, Eastern Hemisphere. Geodynamics announced on July 22, 2013 that the company had commissioned the 1MWe Habanero Pilot Plant and successfully concluded planned step rate testing and an extended turbine test run.

Packers Plus worked closely with Geodynamics to design specialized Inferno™ completions equipment capable of withstanding 300°C (600°F) and 69 MPa (10,000 psi) pressure. This equipment was instrumental to the EGS process, which involves stimulating existing fractures in low-permeability, high-temperature rock to allow water to flow through and be superheated.

 


 

Related News ///

FROM THE ARCHIVE ///

Comments ///

comments powered by Disqus