Press Esc to close

WorldOil

World Oil News Center



Apache resumes Varanus Island gas deliveries

Apache Corp. has formally concluded a force majeure and resumed gas deliveries from a previously disabled pipeline at its Varanus Island development in Western Australia.

A June 3, 2008 pipeline explosion and fire interrupted the operator’s gas deliveries, prompting the imposition of the force majeure, a legal clause that allows a company to miss deliveries because of circumstances beyond its control.

The operator said production is now at a point at which Apache is able to meet its contractual obligations and added the Varanus Island repair project is now in its final ' draw down' phase.

08/10/2009

 

Bookmark and Share


WO DATA HUB

EngineeringTablesIcon-Large

Engineering Data Tables

World Oil's specialized upstream Engineering Data Tables featuring the Drill Bit Classifier, Tubing Tables and more. Get Total Access today.

WO SUPPLEMENTS

2013 Fracturing Technology

2013 Fracturing Technology

MEDIA CENTER

By Digital Publisher

Drill Bit Classifier World Oil published its renowned Drill Bit Classifier in September 2013. The Drill Bit Classifier is a comprehensive listing of major manufacturers' d...

ENERGY EVENTS