Press Esc to close

WorldOil

World Oil News Center



Suncor uses rail, new pipelines to reach record profit

JEREMY VAN LOON

CALGARY, Canada (Bloomberg) -- It’s a long way to send oil from Canada’s landlocked province of Alberta to refineries on the coasts. For Suncor Energy Inc., that can have its advantages: record profit.

Canada’s largest oil producer by market value moved more crude by rail and on new pipelines like TransCanada Corp.’s Gulf Coast system to earn higher prices and reduce its refining feedstock costs in the first quarter.

Like other companies producing bitumen from Canada’s oil sands, Suncor is slowly expanding its shipments to coastal markets while it waits for pipelines like TransCanada’s Keystone XL and Enbridge Inc.’s Northern Gateway to be built. In the meantime, the company is cobbling together a system of rail transport and space on new and existing lines to help booming North American output reach markets.

“We commenced shipping on the Gulf Coast project in the first quarter and we immediately began to experience considerable price lift,” CEO Steve Williams said during an earnings conference call today.

The strategy helped produce record earnings for Calgary-based Suncor in the quarter. Both operating profit at C$1.793 bn ($1.63 bn), or C$1.22 a share, and cash flow from operations at C$2.88 bn were quarterly records, Williams said in a statement yesterday.

Suncor rose 3.3%, the most since August, to C$42.70 at 10:12 a.m. in Toronto. The company has gained 14% this year.

Suncor shipped as much as 70,000 bpd of crude, or about 13% of its output, on the Gulf Coast system in the first quarter. At the same time, it used rail cars to supply its refinery in Montreal with 20,000 bpd of cheaper Canadian oil, replacing more expensive imported feedstock.

The company saved C$20 million at the Montreal refinery by using cheaper North American crude in the quarter, interim CFO Steve Reynish said during the conference call. By next year, Suncor will be able to supply the refinery entirely with oil from Canada and the U.S., he said.

Canada’s oil producers have had to work around transportation delays that risk slowing the pace of an estimated C$32 bn in oil-sands investments this year. Keystone XL, first proposed by TransCanada in 2008, has been delayed at least three times, most recently on April 18 by the U.S. State Department. Enbridge’s Northern Gateway, which is opposed by aboriginal and environmental groups, is awaiting approval from Prime Minister Stephen Harper.

Other pipelines that have been proposed to cope with surging production of oil-sands crude include Kinder Morgan Energy Partners LP’s Trans Mountain and TransCanada’s Energy East.

Working around transportation bottlenecks helped increase prices in the first quarter for North American crudes. West Texas Intermediate averaged $98.61 in the quarter, 4.5% higher than a year earlier, while Western Canada Select, the benchmark for the heavy crude, averaged 16% higher at $77.76.

Oil-sands production is forecast to almost triple to 5.2 MMbpd by 2030 from 1.8 MMbpd in 2012, according to the Canadian Association of Petroleum Producers, an industry lobby group. Currently, most of Canada’s oil is shipped to the U.S.

Suncor is the first major Canadian oil producer to report earnings this quarter. Cenovus Energy Inc. and Imperial Oil Ltd. are scheduled to release quarterly results this week.

04/29/2014

 

Bookmark and Share


WO DATA HUB

EngineeringTablesIcon-Large

Engineering Data Tables

World Oil's specialized upstream Engineering Data Tables featuring the Drill Bit Classifier, Tubing Tables and more. Get Total Access today.

WO SUPPLEMENTS

2013 Fracturing Technology

2013 Fracturing Technology

MEDIA CENTER

By Digital Publisher

Drill Bit Classifier World Oil published its renowned Drill Bit Classifier in September 2013. The Drill Bit Classifier is a comprehensive listing of major manufacturers' d...

ENERGY EVENTS