Press Esc to close

WorldOil

World Oil News Center



Statoil to increase Oseberg crude April program 120 Mbopd

BY CASSIE WERBER

LONDON -- The April program for North Sea Oseberg crude oil is scheduled at 120 Mbopd up from 116 Mbopd originally scheduled for loading in March, a trader who had seen the loading program, said.

April' s program comprises six 600 Mbbl cargoes with a total volume of 3.6 MMbbl, the same as the previous month. April has fewer days than March, however, meaning that the barrel-per-day figure has gone up.

The Oseberg oil field is operated by Norwegian oil company Statoil

Dow Jones Newswires

03/06/2013

 

Bookmark and Share


WO DATA HUB

EngineeringTablesIcon-Large

Engineering Data Tables

World Oil's specialized upstream Engineering Data Tables featuring the Drill Bit Classifier, Tubing Tables and more. Get Total Access today.

WO SUPPLEMENTS

2013 Fracturing Technology

2013 Fracturing Technology

MEDIA CENTER

By Digital Publisher

Drill Bit Classifier World Oil published its renowned Drill Bit Classifier in September 2013. The Drill Bit Classifier is a comprehensive listing of major manufacturers' d...

ENERGY EVENTS