Press Esc to close

WorldOil

World Oil News Center



MEO Australia announces Heron South-1 progress report no. 12

PERTH -- MEO Australia Limited provides the following update in relation to Heron South-1 being drilled in NT/P68, operated by Eni Australia Ltd (Eni). Eni has formally advised MEO that it intends to commence production testing to determine reservoir productivity and gas composition.

The well is interpreted to have intersected two gross sandstone intervals of approximately 120m and 115 m thickness separated by approximately 130 m of shale and silt.

The forward plan is to run a wiper trip to condition the hole prior to running and cementing a 7-in. liner and proceeding with production testing.

In accordance with pre drilling plans, the well will be plugged and abandoned at the conclusion of production testing. MEO’s CEO and MD Jürgen Hendrich commented on the announcement: "Heron South-1 has intersected two potential gas bearing zones over a minimum 365 m gross interval. We are delighted that Eni has elected to commence production testing to determine the potential of these zones."

10/24/2012

 

Bookmark and Share


WO DATA HUB

EngineeringTablesIcon-Large

Engineering Data Tables

World Oil's specialized upstream Engineering Data Tables featuring the Drill Bit Classifier, Tubing Tables and more. Get Total Access today.

WO SUPPLEMENTS

2013 Fracturing Technology

2013 Fracturing Technology

MEDIA CENTER

By Digital Publisher

Drill Bit Classifier World Oil published its renowned Drill Bit Classifier in September 2013. The Drill Bit Classifier is a comprehensive listing of major manufacturers' d...

ENERGY EVENTS

Upcoming Events