Press Esc to close

WorldOil

World Oil News Center



Delphi extended Montney play westward with the 15-21 well

CALGARY -- Delphi announced completion and clean up test results of its delineation well at 15-21-60-23 W5M ("15-21") at East Bigstone. The 15-21 Montney well was drilled to a total depth of 5,875 m with a horizontal lateral length of 2,886 m and stimulated with a 30 stage slickwater hybrid completion.

The well was produced on clean up over a 7 day period, recovering approximately 25% of the initial load frac water and is now shut in to equip and pipeline connect the well for production. After running production tubing, the well produced over the final 24 hours at an average rate of 5.5 mmcfpd of raw gas, 665 bblpd of wellhead condensate (122 bbls/mmcf of raw gas) and approximately 384 bblspd of load frac water.

With an estimated plant NGL yield of 39 bbls/mmcf of raw gas, total production for the 15-21 well over the final 24 hour period was approximately 1,686 boepd, (52% field and plant NGL' s). The well is expected to commence production in February and consistent with the previous slickwater fracture stimulated wells, will continue to recover load frac water over the next few months.

01/29/2014

 

Bookmark and Share


WO DATA HUB

EngineeringTablesIcon-Large

Engineering Data Tables

World Oil's specialized upstream Engineering Data Tables featuring the Drill Bit Classifier, Tubing Tables and more. Get Total Access today.

WO SUPPLEMENTS

2013 Fracturing Technology

2013 Fracturing Technology

MEDIA CENTER

By Digital Publisher

Drill Bit Classifier World Oil published its renowned Drill Bit Classifier in September 2013. The Drill Bit Classifier is a comprehensive listing of major manufacturers' d...

ENERGY EVENTS

Upcoming Events