Press Esc to close

WorldOil

World Oil News Center



Comstock reports drilling results of Eagle Ford Shale well

FRISCO, Texas -- Comstock Resources reported the results of its first well drilled in its East Texas extension of the Eagle Ford Shale in Burleson County, Texas. The Henry A #1H well (100% working interest) was tested at a peak 24-hour average production rate of approximately 1,267 boepd, comprised of 1,023 barrels of oil and 1.5 MMcf of natural gas and had a 6,841 foot completed lateral which was stimulated with 17 stages and 10.2 million pounds of proppant. This well was drilled to a vertical depth of 9,514 ft.

Comstock has 33,900 gross acres prospective for oil in its Burleson County East Texas Eagle Ford Shale play. Comstock' s second well drilled in Burleson County, the Mach A #1H, recently reached total depth and will be completed in July. Locations have been built for the next two wells, the Flencher A #1H and the Curington A #1H. Comstock has plans to drill 10 grosswells in 2014 on its acreage in this new play.

06/27/2014

 

Bookmark and Share


WO DATA HUB

EngineeringTablesIcon-Large

Engineering Data Tables

World Oil's specialized upstream Engineering Data Tables featuring the Drill Bit Classifier, Tubing Tables and more. Get Total Access today.

WO SUPPLEMENTS

2013 Fracturing Technology

2013 Fracturing Technology

MEDIA CENTER

By Digital Publisher

Drill Bit Classifier World Oil published its renowned Drill Bit Classifier in September 2013. The Drill Bit Classifier is a comprehensive listing of major manufacturers' d...

ENERGY EVENTS

Upcoming Events