Press Esc to close

WorldOil

World Oil News Center



Beach Energy spuds Elliston-2 oil development well in Cooper basin

ADELAIDE -- Cooper Energy reported that Elliston-2, an oil development well located in PPL 249 on the western flank of the Cooper Basin, spudded on 22 July, 2014. The rig was drilling 12-1/4 inch surface hole at 162 m.

Elliston-2, a vertical well located 250 m south-southwest of Elliston-1, is prognosed to drill to a total depth of approximately 1,655 m to accelerate production and improve recovery from the Namur Sandstone reservoir. The well is expected to take approximately one week to drill and case.

Cooper Energy holds a 25% interest in PPL 249 with the balance held by the Operator, Beach Energy.

07/23/2014

 

Bookmark and Share


WO DATA HUB

EngineeringTablesIcon-Large

Engineering Data Tables

World Oil's specialized upstream Engineering Data Tables featuring the Drill Bit Classifier, Tubing Tables and more. Get Total Access today.

WO SUPPLEMENTS

2013 Fracturing Technology

2013 Fracturing Technology

MEDIA CENTER

By Digital Publisher

Drill Bit Classifier World Oil published its renowned Drill Bit Classifier in September 2013. The Drill Bit Classifier is a comprehensive listing of major manufacturers' d...

ENERGY EVENTS

Upcoming Events