Press Esc to close

WorldOil

World Oil News Center



Authorities approve re-start at Siri platform

STAVANGER, Norway -- The Danish Energy Agency (DEA) has approved a temporary production solution at the Siri platform.

According to DONG Energy which is the operator of the Siri Fairway fields, this means that production at the Nini, Nini East and Cecilie fields may resume in the first quarter of 2014.

The temporary solution involves transfer of stabilised crude directly to tanker. Certain operating restrictions have been imposed, including de-manning of all personnel when significant wave heights at the platform exceed six meters. Consequently, output from the fields will be difficult to predict, especially in the harsh winter months.

12/24/2013

 

Bookmark and Share


WO DATA HUB

EngineeringTablesIcon-Large

Engineering Data Tables

World Oil's specialized upstream Engineering Data Tables featuring the Drill Bit Classifier, Tubing Tables and more. Get Total Access today.

WO SUPPLEMENTS

2013 Fracturing Technology

2013 Fracturing Technology

MEDIA CENTER

By Digital Publisher

Drill Bit Classifier World Oil published its renowned Drill Bit Classifier in September 2013. The Drill Bit Classifier is a comprehensive listing of major manufacturers' d...

ENERGY EVENTS