Remember me | Forgot password
For full site access: Subscribe Now!
From September 2006 to August 2007, a Proof Of Concept (POC) test of Electro-Thermal Dynamic Stripping Process (ET-DSP) was completed by E-T Energy, Ltd. A numerical simulation study was done prior to the field test to quantify performance metrics, such as the amount of water usage per m3 of produced oil, the energy input requirements, kWhr/m3 of oil (i.e., an equivalent Steam Oil Ratio (SOR) value), greenhouse gas emissions, drilling performance, operating costs and process facility design. Field performance met or exceeded expectations. The recovery factor was greater than 75%, the energy requirement per m3 of oil produced was 23% less than calculated, and peak production rates were greater than expected. The Water-Oil Ratio (WOR) was one with no greenhouse gas emissions in heating the oil. An insignificant volume of sand was produced, and the oil recovered had very little to no emulsions.
To Continue Reading, Purchase a Subscription Today!
This article is premium content. In order to gain access to it please either Log In, or Subscribe Now.
Log In Now or Subscribe
SUBSCRIBE
You may also purchase Pay-Per-View access to view the article for 24 hours for $25.00 US or Request a Quote for a photocopy or custom reprint of the article.
PAY-PER-VIEW QUOTE-REQUEST
World Oil's specialized upstream Engineering Data Tables featuring the Drill Bit Classifier, 2010 Tubing Tables and more. Get Total Access today.
Houston, TX - May 17
San Antonio, TX - May 22-25
Bucharest - May 22-25